1 / 4
It can complete 200-600 meters of canal construction every day, equipped with special trenching buckets and expansion joint tools.
Suitable for U-shaped diversion channels for farmland irrigation and large trapezoidal drainage channels for high-speed railways and expressways.
High efficiency: Requires only two workers to operate. One for dough collection and one for shrinkage seam management.
Technical Parameter Overview: