1 / 5
Our equipment can complete 200-600 meters of canal construction daily. It is equipped with specialized trenching buckets and expansion joint tools. This mechanized solution is ideal for building diversion and drainage canals. Its versatility allows for U-shaped farmland irrigation channels as well as large trapezoidal drainage channels for high-speed railways and expressways.
| Parameter Item | Specifications |
|---|---|
| Adapt to Slope Ratio | 1:2, 1:3, 1:3.5 |
| Adapt to Slope Length | 21.87m, 30.9m, 35.61m |
| Material Speed | 1.25m/min |
| Lining Walking Speed | 0.2-1.2m/min |
| Lining Speed | 5-11m/h |
| Lining Thickness | 60-160mm |
| Total Power | 70.5kw |
Operational Efficiency: Only two workers are required to operate the machine. One manages the dough collection while the other handles shrinkage seams. A 500-meter canal can be completed with minimal effort.